Conclusion and Future Work
After starting this project and discussing
internally with BOR it was determined that a new hydraulic model of the reach
must be developed. After the new model is developed the GIS file should be
updated with a new wse shapefile exported from the
HEC RAS model. From there further analysis will be conducted on the identified
sites shapefile using the attributes table to rank which sites could be
identified as priority maintenance sites.